Southeast of Exira, Iowa
Audubon County
Audubon Co. was 120’x24’6” CCS on a 15-degree skew over Troublesome Creek southeast of Exira. 242 CY of structural concrete. The project included:
- Roadway grading
- Bank shaping
Audubon Co. was 120’x24’6” CCS on a 15-degree skew over Troublesome Creek southeast of Exira. 242 CY of structural concrete. The project included: